Sep 28 - soffit and trim over the master bath and kitchen windows
Sep 28 - soffit and trim over the family room and dining area windows (note the rain still falling!)
Sep 28 - the exterior trim crew finished as much as possible before the rain worsened
Sep 28 - carrying out this big piece of scaffold requires concentration to avoid slipping in the mud
Sep 28 - some of the HVAC openings are being roughed in
Sep 28 - the 2nd bathroom tub has showed up
2nd bathroom tub detail
Sep 28 - all panels are now in place for the family room slider
Sep 30 - new framing for the den/garage wall
Sep 30 - Steve Neil doing additional demo and cleanup
Oct 3 - demo and cleanup are done for this area
Sep 30 - Steve is cutting out old ceiling over where the refrigerator will sit. After the ceiling is cut out, all the attic insulation must be removed as well.
Oct 3 - much of the old kitchen ceiling and insulation above it are gone. You can now look right into the attic!
Detail of all the materials protecting the side of the deck
Sep 27 - basement sump & tile approved. On to pouring the basement floor!
Sep 27 - the basement ready to receive its floor. The concrete chute will use the same small opening as the gravel chute.
Sep 30 - the concrete truck has squished its way into place
Sep 30 - the chute is assembled and concrete is flowing
Sep 30 - view from the family room
Sep 30 - George seems pleased with progress
Sep 30 - the basement subset of the concrete crew
Sep 30 - spreading concrete
Sep 30 - most of the concrete has been poured, spread and rough-leveled
Special boots needed for this work!
Sep 30 - finishing touches
Sep 30 - hey, it looks like a basement floor!
Sep 30 - cleaning out the chute
Sep 30 - cleaning the boots
Ouch, those are the deepest ruts yet...
Sep 30 - scraping up mud that the concrete truck dropped on Sawmill Road (note front wheels off the ground). Work with shovels and brooms followed the skid loader step.