Sep 26 - the rest of the gravel was used to stabilize the mud
Sep 26 - preparing to finish the ends of the big microlams, per the structural engineer's drawing. These pieces are to fill the space between microlam and Simpson tie.
Sep 26 - finishing the ends of the big microlams. Gilligan is nailing the filler pieces to the beam end.