Oct 31 - all the roof drain trenches have been filled. Mike is about to begin some rough grading between family room and master bedroom.
Oct 31 - this area's grade built up considerably due to the various excavation activities over the last three months. Mike pries up the packed earth to loosen it for removal.
Oct 31 - Brian does rough leveling on the way to fill each shovelful