Office doorway - next day, second coat of joint compound
South office wall - second coat of joint compound. All those dark (wet) areas must dry out before sanding can begin.
Nov 7 - office looking northwest. Now we need lots of warm air to dry all this stuff out for sanding. Before the main furnace can be turned on, AEP must connect power and then the furnace must be vented.