Aug 31 - the finished crawlspace footers
Aug 31 - Jeremy Kelley and Rick Scheiderer conduct a conference call with (?)
Aug 31 - the first lumber delivery from Linworth Lumber. The long, darker pieces are the microlam beams that will be placed in the attic to distribute the additional load of the expanded structure.