The grade from street (higher) to garage (lower) was a concern. Rather than replace a questionable design that sloped evenly from street to garage, it was decided to keep the driveway level from garage to approach, with the approach rising to the street. This excavator came in to remove existing drain tiles under the approach, and deepen the trench for new ones.