Rope LED lighting that will sit on top of the DVD shelves
Don figures out how much of the rope lighting to use
Rocky prepares to install the three pendant lights over the peninsula
Marking where the two end fixtures will go
Measure twice, cut once...
Making a hole for the south fixture
Vintage tool #1
Vintage tool #2
All three holes have been cut and wire pulled down from the attic
Now comes the hard part: getting wire to all three holes
Wiring the fixtures
Pendant lights finished
Installing a power strip to serve as our "charging station"
LED strips for under-counter lighting
Master bath fixtures going up
Master bath fixtures completed
Second bath fixture installed
Front and back doorbells installed
Living room trim has been painted
Painted living room trim
Glass has been cemented into the family room cabinet doors
Rick rehangs the cabinet doors. Blue tape marks original locations.
Family room cabinet doors completed. Not looking forward to cleaning that glass...
Opposite end of the family room, almost ready for floor sanding
The living room picture window had a large fabric-covered frame. Steve is cutting it into pieces small enough to take away in the dump trailer.
Rick prepares to mount wire shelving in the laundry room
Completed wire shelving
Three towel hooks ready to install in the shower
Rick measures for the towel hooks. He's been dreading this job because the tile is so hard to drill through.
Rick managed to install two hooks before his drill bits gave out
Towel hooks 1, drill bits 0
Hand-towel holders in master bath
Jeremy removes the protective plastic from the cultured marble (it's what he does when he can't find any wallpaper to pull down!)
Towel hooks in the second bath. These are mounted on cultured marble so were much easier to install.
Coat hooks in the mud room
Step 1 of finishing the hardwood floors: color-matched filler
Filler applied, ready for sanding
Floor sanding equipment
Jeff covers speakers before floor sanding begins